  • 31st Mar, 2017
  • 11:54

    Atlas Communications Outage Notification TT # 228067

    Please find below an update to the outage affecting your services.

    Atlas TT#: 228067
    Start Time: 11:04 on 31st March
    Repair Time: Estimated 17:00 on 31st March

    At 11:04 a number of customer circuits in the Monghan and Armagh areas went down. It is believed that this is a hardware failure and engineers are on route to the Armagh POP with replacement equipment.

    Update 1 - We now believe that the outage has been caused by a fibre cut rather than a hardware failure at our Armagh POP. Engineers are running diagnostics to determine the location of the cut.

    Update 2 - The engineers have determined the suspected location of the damage and are en-route to the site.

    Update 3 - The damaged section has been located and repairs are underway.


    Please email customer.service@atlas-comms.com or call one of the numbers below, quoting the Atlas TT # above if you have any questions or need any further information.

    Kind Regards,

    Atlas Communications (NI) Ltd.

    Phone: 028 9078 6868
    Email: customer.service@atlas-comms.com

  • 18th Jan, 2017
  • 16:54

    Maintenance Notification TT # 226488

    Please be advised that Atlas Communications will be performing the following service affecting maintenance on the dates and times shown below.

    Atlas TT#: 226488
    Start Time: 23.00 on 2nd February 2017
    End Time: 06.00 on 3rd February 2017
    Reason for Maintenance: Repair work to splice joint on the Moira Road in Lisburn.
    Customers Affected: Armagh to Derry

    At the end of last year it was discovered that a fibre joint on the Moira Road in Lisburn had been heavily damaged. Temporary repairs were made at the time to restore service to affected customers, however now a permanent repair needs to be carried out. Non-resilient customers will see an extended outage during this window. Resilient customers will see a hit to traffic as it is redirected over resilient paths.

  • 26th Oct, 2016
  • 13:25

    EMERGENCY Maintenance Notification TT # 224883

    Please be advised that Atlas Communications will be performing the following emergency at-risk maintenance on the dates and times shown below.

    Atlas TT#: 224883
    Start Time: 21:30 Wednesday 26th October
    End Time: 05:30 Thursday 26th October

    Affected: Services in Armagh, Omagh and Derry.

    Reason for Maintenance: This notice is to advise of emergency works to survey and repair a damaged fibre cable in Lisburn. At the current time we are optimistic that it will be possible to repair without causing a disruption to service - however the damage is extensive. As such, effective and permanent repairs may require an interruption to service.

    Please email customer.service@atlas-comms.com or call one of the numbers below, quoting the Atlas TT # above if you have any questions or need any further information.
     

  • 29th Jun, 2016
  • 08:14

    New Domain Name Transfer Policy starting 1st December

    From the 1st December, generic top-level domains (gTLDs, eg. com, net, org, biz, info) will be subject to a new transfer policy that will be triggered by any change to the registrant information of the domain.

    • Any changes to first name, last name, organization or email address fields for the owner of any gTLD domain name will now start a trade process
    • The process involves obtaining explicit confirmation from current and new registrants before a change can be completed
    • After a change of registrant has been completed, previous and new registrant need to receive notifications about the change, with the option of reversing the change
    • After a change of registrant has been completed, the domain is locked for transfers to a new registrar for the following 60 days

     

  • 11th Mar, 2016
  • 14:36

    Maintenance Notification TT # 219753

    Dear Customer,

    Date: 18th March 2016
    Time: 07:30 to 08:30
    Impact: None expected.

    Scope of Work:
    The Atlas Operations team will be performing standard Generator load tests at our Belfast Heron Rd facility. This routine tests ensure that the IDC power systems are operating as intended. Due to the redundancy in our power systems electricity supply to the IDC will be maintained throughout and customers will feel no impact.

    Duration: Tests to be completed before 08:30.

    Please feel free to contact Atlas at any time regarding this notification. Please also notify us if you feel this notice should be directed to another contact at your company.

    How to contact Atlas regarding this notification:

    • Telephone: 02890786999 or 0044 2890786999
    • Email: customer.service@atlas-comms.com

    Kind Regards,

    Atlas Communications (NI) Ltd.